----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Wed Aug 28 16:54:09 GMT 2013 Year: 13 Doy: 240 Observer: berkey WEATHER COMMENT: berkey: Wed Aug 28 16:54:12 GMT 2013 clear skies, temp 45f, wind 10mph from S ___end___ Wed Aug 28 17:20:51 GMT 2013: PSPT Start Patrol Wed Aug 28 19:35:05 GMT 2013 COMP Start Patrol Wed Aug 28 19:45:24 GMT 2013 COMP End Patrol Wed Aug 28 19:46:41 GMT 2013 COMP Start Patrol Wed Aug 28 19:55:07 GMT 2013 COMP End Patrol Thu Aug 29 01:38:01 GMT 2013: PSPT Abort Patrol Thu Aug 29 01:38:05 GMT 2013: PSPT Abort Patrol KCOR COMMENT BY berkey: Thu Aug 29 02:16:34 GMT 2013 Progress today. Spar has been drilled and tapped the drill templates have been removed and the O1 sub-assembly has been installed on the spar. The SBS system was rebuilt with the new rails and reinstalled on the west face of the spar. Down stairs work today included rebuilding the shutters with the new springs, mounting of the occulter post to the field lens and running a few of the dome->control room wires for k-cor and sgs. ___end___