----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Tue Oct 27 17:02:04 GMT 2015 Year: 15 Doy: 300 Observer: stueben WEATHER COMMENT: stueben: Tue Oct 27 17:02:13 GMT 2015 Clear, wind east 5-10 mph, temp 45F. ___end___ Tue Oct 27 17:28:47 GMT 2015 KCOR Start Synoptic Patrol Tue Oct 27 18:22:12 GMT 2015 KCOR End Patrol Tue Oct 27 18:22:13 GMT 2015 KCOR Start Calibration script: c:\kcor\mlso-calibration22deg-20150323.ini Tue Oct 27 18:39:14 GMT 2015 KCOR End Calibration Script Tue Oct 27 18:39:31 GMT 2015 KCOR Start Synoptic Patrol Tue Oct 27 18:39:32 GMT 2015 KCOR Start Synoptic Patrol Tue Oct 27 20:33:27 GMT 2015 Kcor sees an SGS Guiding Error closing lens cover Tue Oct 27 20:33:29 GMT 2015 KCOR End Patrol Tue Oct 27 21:53:06 GMT 2015 Kcor sees an SGS Guiding Error closing lens cover Tue Oct 27 21:53:08 GMT 2015 KCOR End Patrol GENERAL OBSERVATORY COMMENT BY stueben: Tue Oct 27 23:09:36 GMT 2015 The general contractor and his crew arrived about 9:30 this morning. Today they are pouring the concrete pads outside the front and back doors and starting to build the platform for assembly of the new dome. They may also remove the black felting from the upper dome if they have time - in which case I will stop observing and cover the end of the spar. ___end___ ****Possible CME in Progress stueben******: Wed Oct 28 00:27:19 GMT 2015 Cme launched from PA70 starting about 2200UT. ___end___ You can check out the image data at: http://mlso.hao.ucar.edu GENERAL OBSERVATORY COMMENT BY stueben: Wed Oct 28 02:28:02 GMT 2015 The contractor's crew finished pouring the concrete pads and built the platform for the dome. They did not work in the dome or control room so I got a full day of observation with kcor. ___end___ GENERAL OBSERVATORY COMMENT BY stueben: Wed Oct 28 02:30:35 GMT 2015 I continued working on putting the control room back together including connecting the answering machine, powering the printer, connecting it to the network and testing it, powering the desktop computer and connecting to the network, powering the electronics bench/lights. At the end of the day I crudely attached/positioned the automatic dome rotation sensors, but their positions will probably need to be tweaked. ___end___