----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Wed Aug 7 16:05:51 GMT 2019 Year: 19 Doy: 219 Observer: waters WEATHER COMMENT: waters: Wed Aug 7 16:12:56 GMT 2019 Temp 40F with windspeed at about 6-12 mph from the South. Sky looks clear, but the vog looks to be at about 9,000-10,000ft. ___end___ GENERAL COMMENT BY waters: Wed Aug 07 16:21:59 GMT 2019 PM Blew off Kcor O1 ___end___ GENERAL OBSERVATORY COMMENT BY waters: Wed Aug 7 16:22:05 GMT 2019 Windows opened upstairs ___end___ KCOR COMMENT BY waters: Wed Aug 7 17:03:17 GMT 2019 Kcor above dome ___end___ Wed Aug 07 17:03:58 GMT 2019 SGS Alignment complete Wed Aug 07 17:05:04 GMT 2019 Kcor Focus/alignment program exited Wed Aug 07 17:06:10 GMT 2019 KCOR Modulation started in the proper state Wed Aug 07 17:07:26 GMT 2019 KCOR Start Synoptic Patrol KCOR COMMENT BY waters: Wed Aug 7 17:07:55 GMT 2019 Kcor started up in the correct state. ___end___ Wed Aug 07 18:06:14 GMT 2019 KCOR End Patrol Wed Aug 07 18:06:30 GMT 2019 SGS Alignment complete Wed Aug 07 18:06:33 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 18:33:40 GMT 2019 KCOR End Patrol Wed Aug 07 18:33:55 GMT 2019 SGS Alignment complete Wed Aug 07 18:33:54 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 19:03:02 GMT 2019 KCOR End Patrol Wed Aug 07 19:03:19 GMT 2019 SGS Alignment complete Wed Aug 07 19:03:18 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 19:09:31 GMT 2019 KCOR End Patrol Wed Aug 07 19:09:32 GMT 2019 KCOR Start Calibration script: c:\kcor\mlso-calibration22deg-20171025.ini Wed Aug 07 19:24:48 GMT 2019 KCOR End Calibration Script Wed Aug 07 19:25:05 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 19:25:06 GMT 2019 KCOR Start Synoptic Patrol GENERAL OBSERVATORY COMMENT BY waters: Wed Aug 7 19:26:07 GMT 2019 Seems like one of the UPS' was put into place sometime after they came in. Nothiing is currently plugged into it at present. Will try to start moving things over if the weather takes a turn. ___end___ Wed Aug 07 21:41:54 GMT 2019 KCOR End Patrol Wed Aug 07 21:42:35 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 21:47:00 GMT 2019 KCOR End Patrol GENERAL OBSERVATORY COMMENT BY waters: Wed Aug 7 21:46:25 GMT 2019 Some scattered clouds are passing, pushing Kcor through some of it but idling for others. ___end___ Wed Aug 07 21:48:47 GMT 2019 KCOR Start Synoptic Patrol Wed Aug 07 21:51:13 GMT 2019 KCOR End Patrol GENERAL OBSERVATORY COMMENT BY waters: Wed Aug 7 22:57:29 GMT 2019 Closed the dome for some low looking clouds, just in case. ___end___ GENERAL OBSERVATORY COMMENT BY waters: Wed Aug 7 23:08:10 GMT 2019 CoMP ups has Kodiak, Cisco ethernet hub, Kcor's fast ethernet switch, Kcor rack IPC controller, Kcor computer, vga splitter. Moved over Kcor computer, Kcor fast ethernet switch and kcor IPC controller over to the new ups. We also moved the two Kcor Nema boxes onto that ups and then powered Kcor up. Everything looked good. Moved over Cisco ethernet hub and Kodiak over as well. Load is currently at 1175VA and run time is at 35 minutes. Thank you Ben for walking me through this. ___end___ GENERAL OBSERVATORY COMMENT BY waters: Thu Aug 8 00:40:48 GMT 2019 CoMP UPS is powered down. ___end___ GENERAL OBSERVATORY COMMENT BY waters: Thu Aug 8 01:27:39 GMT 2019 Unfortunately, the sky clouded up in the afternoon but it gave me the opportunity to switch things from the old CoMP UPS to the new Kcor UPS. All in all a good day for various tasks. ___end___ ONSITE STAFF: waters