----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Thu Aug 4 17:18:13 GMT 2022 Year: 22 Doy: 216 Observer: berkey WEATHER COMMENT: lisapg: Thu Aug 04 17:18:28 GMT 2022 Temp: 41.2f, Humidity: 35%, Pressure: 28.753in, Wind: 5mph from 255degs, Skies: clear above, but high inversion layer expect to see water/aerosols on site before too long. ___end___ Thu Aug 04 17:19:10 GMT 2022 Running UCOMP Cookbook all_wavelength_coronal_flat.cbk line 0 Thu Aug 04 17:19:42 GMT 2022 Kcor Focus/alignment program exited Thu Aug 04 17:39:46 GMT 2022 Running UCOMP Cookbook all_wavelength_coronal.cbk line 0 Thu Aug 04 18:18:17 GMT 2022 Running UCOMP Cookbook all_wavelength_coronal.cbk line 0 ****EVENT COMMENT BY berkey**** : Thu Aug 04 18:21:11 GMT 2022 Fast get of material leaving the sun near PA 330 at 17:41 UT ___end___ Thu Aug 04 18:56:30 GMT 2022 Running UCOMP Cookbook all_wavelength_coronal.cbk line 0 Thu Aug 04 19:34:34 GMT 2022 Running UCOMP Cookbook all_wavelength_coronal_flat.cbk line 0 Thu Aug 04 19:55:09 GMT 2022 Running UCOMP Cookbook waves_1074_1hour.cbk line 0 GENERAL COMMENT BY berkey: Thu Aug 04 20:18:16 GMT 2022 Clouds blowing up from the saddle. ___end___ Thu Aug 04 20:18:48 GMT 2022 UCoMP Paused for clouds Thu Aug 04 23:48:58 GMT 2022 UCoMP Restarted from pause GENERAL COMMENT BY berkey: Fri Aug 05 00:09:50 GMT 2022 Added 2 1,500W space heaters to the dome to test heating for epoxy flooring. Last few nights dome temp has droped down to ~43F flooring needs ~70F. Starting to see some change in the dome temp monitor; however we expect these 2 heaters wont have enough power to heat the space to the need temp. ___end___ GENERAL COMMENT BY berkey: Fri Aug 05 02:15:18 GMT 2022 Dome temp rose from ~55F to 63F over the past 2 hours. Overall rise is leveling starting to level off I dont expect we will hit 70F with these 2 heaters. ___end___ GENERAL COMMENT BY berkey: Fri Aug 05 02:18:00 GMT 2022 More work today on the remodel, UPS is getting in a better shape. Found some electrical issues we will need to change to accommodate the ups; this should be taken care of tomorrow. New electrical plugs in cleanroom and contorl room have been wired and powered up. Framing of the sliding doors is coming along look like Mark has detailed plan figured out and should be able to finish framing tomorrow. ___end___ ONSITE STAFF: berkey, Mark S, Tom W