----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Wed Sep 09 17:19:18 GMT 2026 Year:26 Doy:252 Observer: berkey Weather COMMENT BY berkey: Wed Sep 09 17:19:56 GMT 2026 entry was edited Skies bright but mostly clear above but we are below the inversion layer so fog could show up at any point. ___end___ ** KCOR PM berkey ** : Wed Sep 09 17:20:01 GMT 2026 Blew off Kcor O1 ___end___ ** GENERAL PROBLEM REPORTED BY berkey ** : Wed Sep 09 17:23:02 GMT 2026 Internet down Looks like there is a network issue in the Barnes building. Atlas/network UPS was beeping when we came on site. The beeping was reset but it looked like the network was online. But facility still appears down. ___end___ GENERAL COMMENT BY berkey: Wed Sep 09 18:00:47 GMT 2026 entry was edited Dome closed ___end___ BY berkey: Wed Sep 09 19:00:41 GMT 2026 Tower construction team on site. ___end___ ** Guider/spar PROBLEM REPORTED BY berkey ** : Wed Sep 09 19:06:39 GMT 2026 SGS prox sensor 5 V power supply failed. On startup this morning all 3 prox sensor (home, +/- EOT travel) LEDs lite up on the GUI front panel. Trouble shooting showed the SOLA 5-5-100 T power supply did not have an "OK" led illuminated and the output showed 0 V while the input had the expected 120 V. Further troubleshooting with the prox sensor load disconnected showed no short on the load side. Power supply was then replaced with an onsite spare. New PS shows 5 V output and prox sensors show expected behavior. Note the prox sensors do not effect guiding performance in SGS they are only used to provide feedback to the observer about were we are in the dec arm range and to provide and to provide an end of range limit system to prevent the dec arm from hitting a physical end of range. ___end___ GENERAL COMMENT BY berkey: Wed Sep 09 19:30:26 GMT 2026 entry was edited Building maintenance electrical installers on site. ___end___ ** GENERAL PROBLEM REPORTED BY berkey ** : Wed Sep 09 20:49:05 GMT 2026 Rebooting the Atlas inverter per instructions from that team brought the internet back online. ___end___ GENERAL COMMENT BY berkey: Wed Sep 09 23:30:33 GMT 2026 Tower construction team has left the mountain. ___end___ BY berkey: Thu Sep 10 00:58:35 GMT 2026 No data today. ___end___ GENERAL COMMENT BY berkey: Thu Sep 10 01:03:42 GMT 2026 Electricians cleaned up the old inverter step. Installed the 2-15K s that we plan to use, and are in the process of connected up the missing solar panels. The outside team is in the process of connecting up all of the panels, during the last version ~8 were never cabled into a string. ___end___ Logger COMMENT BY berkey: Thu Sep 10 01:03:47 GMT 2026 Log closed ONSITE STAFF: berkey ___end___ Logger COMMENT BY : Thu Sep 10 01:06:17 GMT 2026 Log closed ONSITE STAFF: ___end___