----------------------------------------------------------------------------- Mauna Loa Solar Observatory Observer's Log ----------------------------------------------------------------------------- Tue Sep 29 16:23:26 GMT 2026 Year:26 Doy:272 Observer: mcotter Weather COMMENT BY mcotter: Tue Sep 29 16:28:39 GMT 2026 MLSO Current Weather Timestamp (UTC): 2026-09-29 16:20:00 Temperature : 39.72 deg F Dew Point : 24.95 deg F Pressure : 679.56 mbar Wind Speed : 8.5 mph Wind Direction : 210.6 deg Skies: Clear but very hazy skies with patches of Cirrus clouds visible on the far east and west horizons. The inversion layer is visible on the horizon well above Haleakala. Cold this morning with spots of frost visible on surfaces. ___end___ GENERAL COMMENT BY mcotter: Tue Sep 29 16:39:28 GMT 2026 Dome open. The dome area windows remain closed at this time due to moderate winds from the south. ___end___ ** KCOR PM mcotter ** : Tue Sep 29 16:39:41 GMT 2026 Blew off Kcor O1 ___end___ ** UCOMP PM mcotter ** : Tue Sep 29 16:39:49 GMT 2026 Blew off UCoMP O1 ___end___ Tue Sep 29 17:13:14 GMT 2026 Kcor Focus/alignment program exited KCOR BY mcotter: Tue Sep 29 17:18:22 GMT 2026 Kcor: The Sun arrives over the dome sill for the Kcor instrument to observe at approximately 0714 HST. An attempt was made to put Kcor on sky to observe but the sky is much too bright to observe at this time. ___end___ Tue Sep 29 18:20:29 GMT 2026 Kcor Focus/alignment program exited Tue Sep 29 18:56:04 GMT 2026 Report Time: 18:55:44 UTC Image: 20260929_184805_kcor_l2_nrgf.gif Obs time: 18:48:05 First Seen: 18:34:11 UT CME Front Height: 1.69 Rs (front) CME Front Angle: 268.4 East Edge Angle: 267.0 West Edge Angle: 276.9 Angular Width: 10.0 CME Speed: moderate CME Brightness: moderate Confidence: high Observer Comment: Long thin CME observed launching from western hemisphere. GENERAL COMMENT BY mcotter: Tue Sep 29 19:25:19 GMT 2026 noaa construction: Site construction has started on the site for the day and unfortunately there are signs of dust in the spar web cam image. ___end___ KCOR COMMENT BY mcotter: Tue Sep 29 19:26:48 GMT 2026 Kcor: Due to NOAA onsite construction taking place observations have been paused due to dust being generated by heavy equipment. ___end___ KCOR COMMENT BY mcotter: Tue Sep 29 20:39:50 GMT 2026 Kcor: Onsite construction has ended for today and Kcor is back on sky and observing. ___end___ ** KCOR PM mcotter ** : Tue Sep 29 20:40:13 GMT 2026 Blew off Kcor Field Lens ___end___ Tue Sep 29 20:59:55 GMT 2026 KCOR Start Calibration script: c:\kcor\mlso-calibration22deg-20171025.ini Tue Sep 29 21:15:09 GMT 2026 KCOR End Calibration Script ** KCOR PM mcotter ** : Tue Sep 29 22:26:36 GMT 2026 Washed Kcor O1. O1# SN3 was washed with soap and water. Lens was mostly clean but there was some dust and residue on both surfaces. SN3 will remain in the flow bench until we are ready to go on sky. ___end___ BY mcotter: Wed Sep 30 00:51:58 GMT 2026 Orographic clouds came into the observatory area from the south and west and completely obscured the Sun. The dome was closed and the instrument and spar were stopped. ___end___ Wed Sep 30 00:53:39 GMT 2026 Kcor Focus/alignment program exited KCOR COMMENT BY KCOR: Wed Sep 30 00:54:23 GMT 2026 KCOR file transfer report KCor created 868 .bin files 868 .fts files Remote site is complete ? no rsync required. ___end___ BY mcotter: Wed Sep 30 02:26:09 GMT 2026 End Of Day: Good observing in the morning until clouds came up in the early afternoon. ___end___ Logger COMMENT BY mcotter: Wed Sep 30 02:26:14 GMT 2026 Log closed ONSITE STAFF: mcotter ___end___